Skip to content

CI

CI #1195

Triggered via schedule December 24, 2024 12:32
Status Failure
Total duration 1m 25s
Artifacts

CI.yaml

on: schedule
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 2 warnings
test (ubuntu-latest, 3.10)
Process completed with exit code 1.
test (macOS-latest, 3.9)
Process completed with exit code 1.
test (ubuntu-latest, 3.9)
Process completed with exit code 1.
test (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
test (ubuntu-latest, 3.11)
The operation was canceled.
test (macOS-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
test (macOS-latest, 3.11)
The operation was canceled.
test (macOS-latest, 3.10)
The job was canceled because "ubuntu-latest_3_10" failed.
test (macOS-latest, 3.10)
The operation was canceled.
test (ubuntu-latest, 3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test (ubuntu-latest, 3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636