Skip to content

Bump actions/setup-go from 5.1.0 to 5.2.0 (#88) #299

Bump actions/setup-go from 5.1.0 to 5.2.0 (#88)

Bump actions/setup-go from 5.1.0 to 5.2.0 (#88) #299

Triggered via push December 12, 2024 18:48
Status Failure
Total duration 41m 41s
Artifacts 4
Matrix: test-full-e2e
Matrix: test-sensor-e2e
Fit to window
Zoom out
Zoom in

Annotations

22 errors and 5 warnings
test-full-e2e (ubuntu-latest, golang)
Process completed with exit code 2.
test-full-e2e (ubuntu-latest, ruby)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, php)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, rust)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, python)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, java)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, java)
The operation was canceled.
test-full-e2e (ubuntu-latest, dotnet)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, dotnet)
The operation was canceled.
test-full-e2e (ubuntu-latest, compose)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, compose)
The operation was canceled.
test-full-e2e (ubuntu-latest, node)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, node)
The operation was canceled.
test-full-e2e (ubuntu-latest, http-probe)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, http-probe)
The operation was canceled.
test-full-e2e (ubuntu-latest, haskell)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, haskell)
The operation was canceled.
test-full-e2e (ubuntu-latest, distroless)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, distroless)
The operation was canceled.
test-full-e2e (ubuntu-latest, image-edit)
The job was canceled because "ubuntu-latest_golang" failed.
test-full-e2e (ubuntu-latest, image-edit)
The operation was canceled.
test-sensor-e2e (ubuntu-latest)
Process completed with exit code 2.
build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-full-e2e (ubuntu-latest, elixir)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-full-e2e (ubuntu-latest, golang)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-sensor-e2e (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test-sensor-e2e (ubuntu-latest)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
dist_linux Expired
69.9 MB
dist_linux_arm Expired
65.4 MB
dist_linux_arm64 Expired
64 MB
dist_mac Expired
68.8 MB