Skip to content

Commit

Permalink
Add UPS step to install/removal procedure
Browse files Browse the repository at this point in the history
  • Loading branch information
joseph-long committed Nov 10, 2024
1 parent 503f601 commit f0f16fc
Show file tree
Hide file tree
Showing 2 changed files with 3 additions and 0 deletions.
2 changes: 2 additions & 0 deletions handling/telescope_install.rst
Original file line number Diff line number Diff line change
Expand Up @@ -358,6 +358,8 @@ Install Electronics and Cable

- Install all cables but the 2K DM cables

- Power on the UPS located in the electronics rack

Install AOC in Control Room
---------------------------

Expand Down
1 change: 1 addition & 0 deletions handling/telescope_removal.rst
Original file line number Diff line number Diff line change
Expand Up @@ -38,6 +38,7 @@ Shutdown
- Electronics Rack

- Ensure that roll-out shelves are restrained
- Power off the UPS located in the electronics rack
- Close and lock doors
- Tape keys down

Expand Down

0 comments on commit f0f16fc

Please sign in to comment.