Skip to content

Commit

Permalink
Update legs_air_setup.rst
Browse files Browse the repository at this point in the history
Fixing of typos
  • Loading branch information
jkueny authored Nov 5, 2024
1 parent fb1a903 commit caf193d
Showing 1 changed file with 3 additions and 3 deletions.
6 changes: 3 additions & 3 deletions handling/legs_air_setup.rst
Original file line number Diff line number Diff line change
Expand Up @@ -2,13 +2,13 @@ Setting up the PEPS II and DM air system
========================================

This procedure details how to set up the air supply for the self-leveling floating table system (PEPS II) and the MEMS DMs.
The procedure was documented in the LCO clean room, but these steps should be mimicked when installed MagAO-X on the telescope.
The procedure was documented in the LCO clean room, but these steps should be mimicked when installing MagAO-X on the telescope.

Estimated time to complete if MagAO-X is not on legs: 1.0 hr
Estimated time to complete if just setting up air: 0.5 hr


If MagAO-X has yet to be Installed on the Legs
If MagAO-X has yet to be installed on the Legs
---------------------------------------------------


Expand Down Expand Up @@ -70,7 +70,7 @@ Step 2: Take the long part of the plastic air tubing and lead to the instrument.

.. image:: figures/cleanroom_air_yfitting.jpeg

Step 3: Connect any one side of the y-fitting to the tubing connected to the air flow regulator. This portion of the air supply will go to the DM chambers for humidity mitigation.
Step 3: Connect any one side of the y-fitting to the tubing connected to the air flow regulator. This portion of the air supply will go to the DM chambers for humidity control.

.. image:: figures/dm_air_regulator.jpeg

Expand Down

0 comments on commit caf193d

Please sign in to comment.