Skip to content

Commit

Permalink
Add est. weight of cart + instrument, reference to detailed shutdown …
Browse files Browse the repository at this point in the history
…procedure.
  • Loading branch information
joseph-long committed Nov 6, 2024
1 parent caf193d commit ba74605
Show file tree
Hide file tree
Showing 2 changed files with 10 additions and 5 deletions.
7 changes: 5 additions & 2 deletions handling/telescope_install.rst
Original file line number Diff line number Diff line change
Expand Up @@ -16,7 +16,10 @@ Initial Conditions
Preparations
------------

- Shutdown MagAO-X
- If operating, shut down MagAO-X.

- Make sure to leave stages/wheels in positions that are safe for transportation
- Complete procedure in the :ref:`telescope removal procedure <tel_remove_shutdown>`

- Prepare Legs for Move

Expand Down Expand Up @@ -157,7 +160,7 @@ Rig Onto Cart

- Position two people to remove the legs from under the table

- Begin SLOWLY lifting the table off the legs.
- Begin SLOWLY lifting the table off the legs. Once table is fully supported by the crane, the scale will read around 2000 lbs (as of March 2024).

- Go up 0.5inch then stop and inspect the platters. Use a long flathead screwdriver to very gently pry any stuck platters off bottom of table.

Expand Down
8 changes: 5 additions & 3 deletions handling/telescope_removal.rst
Original file line number Diff line number Diff line change
Expand Up @@ -13,14 +13,16 @@ Initial Conditions

- Instrument on Magellan Clay Nasmyth Platform, operating.

.. _tel_remove_shutdown::

Shutdown
------------

- At the end of the last night, have the TO position the telescope so that the NASE platform faces the elevator.

- Power down all of MagAO-X

- Ensure that ``stagepickoff`` in the ``tel`` position.
- Ensure that ``stagepickoff`` is in the ``tel`` position.
- Place the k-mirror at 0 degrees.
- Select the Ha-narrow and CH4-875 filters on fwsci1/2
- turn off power for all devices on MagAO-X following the regular shutdown procedure.
Expand Down Expand Up @@ -115,8 +117,8 @@ Rig Onto Cart
- Reposition the load spreader center to the instrument + cart
position marked on it.

- Install the triangle stabilizing ropes between the crane hook and
the lifting fixture IAW the below figure. Tighten, but do not cause
- Install the triangle stabilizing ropes between the crane hook and
the lifting fixture in accordance with the below figure. Tighten, but do not cause
them to pick the load.

.. image:: figures/stabilizers.jpg
Expand Down

0 comments on commit ba74605

Please sign in to comment.