Skip to content

chore(deps): update all dependencies #529

chore(deps): update all dependencies

chore(deps): update all dependencies #529

Triggered via pull request November 7, 2024 16:02
Status Failure
Total duration 3m 9s
Artifacts 3

ci.yaml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 3 warnings
Lint: internal/controller/telemetry/collector_controller.go#L41
could not import github.com/kube-logging/telemetry-controller/internal/controller/telemetry/otel_conf_gen (-: # github.com/kube-logging/telemetry-controller/internal/controller/telemetry/otel_conf_gen
Lint: internal/controller/telemetry/otel_conf_gen/otel_conf_gen.go#L252
cannot use &extensionNames (value of type *[]string) as []string value in struct literal) (typecheck)
Lint: internal/controller/telemetry/otel_conf_gen/otel_conf_gen.go#L252
cannot use &extensionNames (value of type *[]string) as []string value in struct literal (typecheck)
Lint
Process completed with exit code 2.
Test: internal/controller/telemetry/otel_conf_gen/otel_conf_gen.go#L252
cannot use &extensionNames (value of type *[]string) as []string value in struct literal
Test
cannot use &extensionNames (value of type *[]string) as []string value in struct literal
Test
Process completed with exit code 2.
Artifacts / Container image
buildx failed with: ERROR: failed to solve: process "/bin/sh -c CGO_ENABLED=0 GOOS=${TARGETOS:-linux} GOARCH=${TARGETARCH} go build -a -o manager cmd/main.go" did not complete successfully: exit code: 1
License check
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Lint
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
Test
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2

Artifacts

Produced during runtime
Name Size
[helm-chart] Helm chart
148 KB
[helm-chart] Trivy scan results Expired
4.85 KB
kube-logging~telemetry-controller~U1L7G2.dockerbuild
34.4 KB