Skip to content

[Release-1.29] Jan 2025 Testing Overhaul, E2E to Docker Migration #2062

[Release-1.29] Jan 2025 Testing Overhaul, E2E to Docker Migration

[Release-1.29] Jan 2025 Testing Overhaul, E2E to Docker Migration #2062

Triggered via pull request February 7, 2025 18:14
Status Failure
Total duration 48m 16s
Artifacts 5

e2e.yaml

on: pull_request
Matrix: Build Go Tests
Matrix: E2E Tests
Matrix: Docker
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
Docker (lazypull, arm64)
Process completed with exit code 1.
Docker (skew, amd64)
Process completed with exit code 1.
Docker (skew, arm64)
Process completed with exit code 1.
E2E Tests (wasm)
Process completed with exit code 1.
E2E Tests (startup)
The job running on runner GitHub Actions 632 has exceeded the maximum execution time of 40 minutes.
E2E Tests (startup)
The operation was canceled.
E2E Tests (btrfs)
Codecov: Failed to properly upload report: The process '/home/runner/work/_actions/codecov/codecov-action/v4/dist/codecov' failed with exit code 1

Artifacts

Produced during runtime
Name Size
docker-go-tests-amd64 Expired
153 MB
docker-go-tests-arm64 Expired
140 MB
k3s
125 MB
k3s-arm64
117 MB
wasm-journald-logs
22 KB