docs: fill in gaps from v15-16 #1436
Triggered via pull request
February 18, 2025 13:23
Status
Failure
Total duration
1h 21m 7s
Artifacts
–
test_integration.yml
on: pull_request
Build
20s
Matrix: Add Machine
Matrix: Integration
Annotations
2 errors
Integration (1.9.*, 5.21/stable, microk8s, 1.28-strict, 3.1)
The job running on runner juju-openstack-amd64-jammy-large-ps6-0-e328e6dffd07 has exceeded the maximum execution time of 60 minutes.
|
Integration (1.9.*, 5.21/stable, microk8s, 1.28-strict, 3.1)
The operation was canceled.
|