Skip to content

Corrected the go list command #2

Corrected the go list command

Corrected the go list command #2

Triggered via push September 23, 2024 11:12
Status Failure
Total duration 2m 0s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (1.21)
Process completed with exit code 1.
build (1.22)
The job was canceled because "_1_21" failed.
build (1.22)
Process completed with exit code 1.
build (1.23)
The job was canceled because "_1_21" failed.
build (1.23)
The operation was canceled.