Refactor subscription mechanism #118
test.yml
on: push
Matrix: ES 21.6.0
Matrix: ES 4.1.0
Matrix: ES 5.0.11
Annotations
8 errors
ES 4.1.0 (1.15, 24):
test/extreme/event_producer_test.exs#L431
test ack timeout can be adjusted (Extreme.EventProducerTest)
|
ES 4.1.0 (1.15, 24)
Process completed with exit code 2.
|
ES 4.1.0 (1.15, 26)
The job was canceled because "_1_15_24" failed.
|
ES 4.1.0 (1.15, 26)
The operation was canceled.
|
ES 4.1.0 (1.16, 24)
The job was canceled because "_1_15_24" failed.
|
ES 4.1.0 (1.16, 24)
The operation was canceled.
|
ES 4.1.0 (1.16, 25)
The job was canceled because "_1_15_24" failed.
|
ES 4.1.0 (1.16, 25)
The operation was canceled.
|