You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
in budget, if a line (section, subsection or product) as the unity "hour" or "day", the quantity is added in the matching task (linked to the budget line. cf issues 10 and 11) in the field "planned hours"
The text was updated successfully, but these errors were encountered:
in budget, if a line (section, subsection or product) as the unity "hour" or "day", the quantity is added in the matching task (linked to the budget line. cf issues 10 and 11) in the field "planned hours"
The text was updated successfully, but these errors were encountered: