Skip to content

build(deps): bump google.golang.org/protobuf from 1.31.0 to 1.32.0 in /api/v2 #2599

build(deps): bump google.golang.org/protobuf from 1.31.0 to 1.32.0 in /api/v2

build(deps): bump google.golang.org/protobuf from 1.31.0 to 1.32.0 in /api/v2 #2599

Triggered via pull request December 25, 2023 04:41
Status Failure
Total duration 2m 11s
Artifacts

ci.yaml

on: pull_request
Matrix: Artifacts / Container image
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Lint
Process completed with exit code 2.
Artifacts / Container image (distroless)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c make release-binary" did not complete successfully: exit code: 2
Artifacts / Container image (alpine)
The job was canceled because "distroless" failed.
Artifacts / Container image (alpine)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c make release-binary" did not complete successfully: exit code: 2
Test
Process completed with exit code 2.