Update dependencies #519
ci.yaml
on: pull_request
Build binaries
27s
Small tests
5m 10s
Matrix: End-to-End Tests
Annotations
6 errors
End-to-End Tests (v1.31.6)
Process completed with exit code 2.
|
End-to-End Tests (v1.30.10)
The job was canceled because "v1_31_6" failed.
|
End-to-End Tests (v1.30.10)
The operation was canceled.
|
End-to-End Tests (v1.29.14)
The job was canceled because "v1_31_6" failed.
|
End-to-End Tests (v1.29.14)
The operation was canceled.
|
Small tests
Process completed with exit code 2.
|