Skip to content

fix ODA-04: Embed initialization gap #128

fix ODA-04: Embed initialization gap

fix ODA-04: Embed initialization gap #128

Triggered via pull request December 4, 2024 21:43
Status Cancelled
Total duration 22h 12m 53s
Billable time 1d 0h 8m
Artifacts

contract-tests.yml

on: pull_request
Test unit
3m 30s
Test unit
Contract tests
0s
Contract tests
4844 tests
6h 0m
4844 tests
Test e2e
6h 0m
Test e2e
Test e2e custom fee token
6h 0m
Test e2e custom fee token
Test e2e fee token with 6 decimals
6h 0m
Test e2e fee token with 6 decimals
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Test e2e
The job running on runner linux-2xl_2ed7dd823fcd has exceeded the maximum execution time of 360 minutes.
Test e2e
The operation was canceled.
4844 tests
The job running on runner linux-2xl_5bff647b9898 has exceeded the maximum execution time of 360 minutes.
Test e2e custom fee token
The job running on runner linux-2xl_ed144b07c6fb has exceeded the maximum execution time of 360 minutes.
Test e2e fee token with 6 decimals
The job running on runner linux-2xl_3f73816ea159 has exceeded the maximum execution time of 360 minutes.
Contract tests
The run was canceled by @epociask.