mention the property removal in the changelog #65
ci.yml
on: push
Matrix: CS
Matrix: Fixtures
Matrix: Tests
Matrix: Psalm
Annotations
12 errors
Tests (ubuntu-latest, 8.2, highest)
Process completed with exit code 1.
|
Tests (macOS-latest, 8.3, lowest)
The job was canceled because "ubuntu-latest_8_2_highest" failed.
|
Tests (macOS-latest, 8.3, highest)
The job was canceled because "ubuntu-latest_8_2_highest" failed.
|
Tests (macOS-latest, 8.2, lowest)
The job was canceled because "ubuntu-latest_8_2_highest" failed.
|
Tests (macOS-latest, 8.2, highest)
The job was canceled because "ubuntu-latest_8_2_highest" failed.
|
Tests (macOS-latest, 8.2, highest)
The operation was canceled.
|
Tests (ubuntu-latest, 8.3, highest)
The job was canceled because "ubuntu-latest_8_2_highest" failed.
|
Tests (ubuntu-latest, 8.3, highest)
The operation was canceled.
|
Tests (ubuntu-latest, 8.3, lowest)
The job was canceled because "ubuntu-latest_8_2_highest" failed.
|
Tests (ubuntu-latest, 8.3, lowest)
The operation was canceled.
|
Tests (ubuntu-latest, 8.2, lowest)
The job was canceled because "ubuntu-latest_8_2_highest" failed.
|
Tests (ubuntu-latest, 8.2, lowest)
The operation was canceled.
|