Skip to content

Latest commit

 

History

History
56 lines (41 loc) · 3.1 KB

2019-04.md

File metadata and controls

56 lines (41 loc) · 3.1 KB

I3S ESSnet

Monthly reporting: 15 April 2019

Work package 1

Action Progress Next steps Comments
RELAIS: Modelled the current architecture and capabilities 100%
  • Preparing live demo for Rome hackathon;
  • Modeling the TO-BE architecture
Istat
ARC: Initial assessment of the optimal solution to integrate RELAIS and ARC functionalities 30%
  • Preparing live demo for Rome hackathon;
  • Modeling the TO-BE architecture
Istat
Try PX-web current version 75% INE
- Get Package PX-web / Install basic configuration / Test Local installation 100% INE
- Generate INE data files from PX concepts 100% INE
- Check how the PX information models work and map to dissemination and metadata structure 75% INE
- Check what is required to run the ”open” version (upcoming) of PX-web 50% INE
- Calculate impact on adapting existing dissemination chain 50% INE

Work package 2

Action Progress Next steps Comments
Planning in detail (end feb/start of mars) VC 30% Set date for VC SCB,ISTAT,INSEE,SSB
Setup google-drive documents and share plus share prezi 0% SCB
Setup the general structure of the documents 0% SCB

Work package 3

Action Progress Next steps Comments
Simple Vagrant-file for building a virtual machine with Docker and Docker-compose 20% SSB, INSEE (Frédéric++?, Romain)
Simple guidelines for developers for how to containarize existing services 0% SSB, INSEE
Documentation for setting up a first version of a simple reference environment. 0% SSB, INSEE, WP2
Build regime for images with automated testing 0% SSB, INSEE

Work package 4

Action Progress Next steps Comments
Working story of reuse of PX-web 50% INE
Reuse of tau-Argus / mu-Argus 25% INE
Testimonies of end users / participants to ESSnet projects 25% INE
Hackathon Rome – Success stories Define track 3 25% INE / INSEE

Work package 5

Action Progress Next steps Comments
Minutes of KO meeting 100%
Creation of logo 100%
Preparation of Rome hackathon 50% Detailed organisation of each session All partners
Documentation of ARC 80% With Istat