fix: date and sync release note to v1.0.1 (#3152) #35
build_and_test.yaml
on: push
lint
3m 29s
gen-check
2m 14s
license-check
5s
coverage-test
3m 47s
Matrix: conformance-test
Matrix: e2e-test
publish
0s
Annotations
6 errors
conformance-test (v1.28.7)
Process completed with exit code 2.
|
e2e-test (v1.29.2)
Process completed with exit code 2.
|
e2e-test (v1.27.11)
The job was canceled because "v1_29_2" failed.
|
e2e-test (v1.27.11)
The operation was canceled.
|
e2e-test (v1.26.14)
The job was canceled because "v1_29_2" failed.
|
e2e-test (v1.26.14)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
envoy-gateway
Expired
|
147 MB |
|