Skip to content

fix: date and sync release note to v1.0.1 (#3152) #35

fix: date and sync release note to v1.0.1 (#3152)

fix: date and sync release note to v1.0.1 (#3152) #35

Triggered via push April 10, 2024 03:27
Status Failure
Total duration 23m 5s
Artifacts 1
Matrix: conformance-test
Matrix: e2e-test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

6 errors
conformance-test (v1.28.7)
Process completed with exit code 2.
e2e-test (v1.29.2)
Process completed with exit code 2.
e2e-test (v1.27.11)
The job was canceled because "v1_29_2" failed.
e2e-test (v1.27.11)
The operation was canceled.
e2e-test (v1.26.14)
The job was canceled because "v1_29_2" failed.
e2e-test (v1.26.14)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
envoy-gateway Expired
147 MB