Skip to content

Euclid 2.10, Joda-Time 2.13, Commons IO 2.18, and Log4j 2.24.3 #165

Euclid 2.10, Joda-Time 2.13, Commons IO 2.18, and Log4j 2.24.3

Euclid 2.10, Joda-Time 2.13, Commons IO 2.18, and Log4j 2.24.3 #165

Re-run triggered January 19, 2025 08:25
Status Failure
Total duration 29s
Artifacts

maven.yml

on: push
Matrix: build
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
build (8)
Process completed with exit code 1.
build (11)
The job was canceled because "_8" failed.
build (11)
Process completed with exit code 1.
build (19)
The job was canceled because "_8" failed.
build (19)
The operation was canceled.
build (17)
The job was canceled because "_8" failed.
build (17)
The operation was canceled.
build (8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636