Specify (1) | Done | Implement (2) | Done | Validate (2) | Done |
---|---|---|---|---|---|
Add symlink dir for titles | establish published_other dir | ||||
establish unpublished dir | |||||
establish published_base dir | |||||
add procedure for creating a reference entry | |||||
create a reference entry for each published paper | |||||
reference papers mentioned in BASE-9 src |
Task |
---|
Work should only move from a major column to the corresponding “Done” column when it meets the requirements listed below.
- Compound steps are broken down
- Step is complete
- All new/modified links to external entities are valid
Work-in-progress (WIP) limits are in parenthesis after each major category. WIP describes the total number of tasks in a category pair (named and “Done”).
As the “Specify” step frequently results in multiple specified tasks per input, the task count in this column is based on the number of input items currently represented (directly or by a derived task) in the category. If, for example, the “Specify” column contained one task, the specification of which resulted in 4 “Done” tasks, any or all of those four tasks count as a single collective task for the purposes of “Specify“‘s WIP. Once those items are individually removed from “Done” into “Implement”, their individual WIP contribution is 1.