You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
During a data run the probe moves on command from the DAQ system, i.e. it moves when commanded to move. You may have recalled @svincena and I talking about the "data run sequence," this is the mechanism that controls the sequence of operations (including commanding the probe to move) during a data run.
How long should we make the probes spend at each point in the motion list? Should this be a parameter added to the run config? Or the group config?
The text was updated successfully, but these errors were encountered: